Call Now+234 803 304 5484, +234 906 000 2299

Send Message[email protected]

Location: Accra - Ghana

Start Date: 18 Mar, 2024

End Date: 22 Mar, 2024

WiFiFree WiFi available

$6,500

Event Details

Equipment readiness for a commercial service is proven by testing all function under different conditions.  “Do not believe, until it is proven” is the key to successful testing and satisfactory operation of electric systems.  Equipment is finally proven when it is energized and testing on load during the start-up.  This workshop covers all aspects of testing in electrical systems, performed during construction or maintenance.

 

CONTENT:

Introduction

· Construction overview

· Construction to the system

· Construction stages

· Start up

 

Substation Commissioning

· Commissioning overview

· Commissioning methodology

· Planning Commissioning

 

Commissioning Tests

 · Type of test

· Tests sequence

· Commissioning plan

 

First energerisation

· First enegeisation overview

· First enegeisation inspection

· Commissioning switching plan

 

Off-Load Tests

· Insulation resistance tests

· Primary injections

· Secondary injections

· Tests on DC operation simulation tests

· Other tests

 

Commission Documentation

· Commissioning certificates

· Managing Commissioning

· As built drawings

 

Health and Safety in Commissioning

· Testing Area

· Safety System

· Managing the environment

· Managing risks

 

FOR WHOM:

Works, Services and Maintenance Personnel

 

TRAINING METHODOLOGY

The training methodology combines lectures, discussions, group exercises and illustrations. Participants will gain both theoretical and practical knowledge of the topics. The emphasis is on the practical application of the topics and as a result participant will go back to the workplace with both the ability and the confidence to apply the techniques learned to their duties.

 

This course is available in the following locations:

Nigeria - $5500
Rwanda - $7500
UK - $8500
USA - $8500

Venue

SunLodge Hotel, Saxel Estate, 76 Fourth Road, Tesano – Accra, Ghana.

Other Dates

Start Date End Date
29 Jul, 2024 02 Aug, 2024
Start Date End Date
18 Mar, 2024 22 Mar, 2024